Project
This is the official announcement of the class project.
Overview of project deadlines:
| Week | Due | Deliverable |
|---|---|---|
| Week 2 | Wed Oct 7 | Report 1 – Concept: benchmark review of existing printers and DIY builds (cited); team-defined requirements (build volume, target accuracy, speed/acceleration, footprint, budget); comparison of at least three motion architectures; selected concept with justification. |
| Week 4 | Wed Oct 21 | Report 2 – Preliminary design: full CAD assembly including the electronics bay; load-case definition; hand calculations (inertial loads, belt/lead-screw sizing, motor torque check, rod/frame deflection); preliminary BOM and cost estimate. Write the report in Overleaf/LaTeX and share the project with me. On Gradescope, submit your CAD model along with a video, under 6 minutes per team, that walks through it. Every team member should take part in the video. Explain the rationale behind your design decisions. |
| Week 6 | Wed Nov 4 | Report 3 – Detailed design & design freeze: static FEA with mesh convergence compared to hand calculations; fatigue analysis of the critical component; tolerances, fits and alignment strategy; final component selection, BOM and manufacturing plan. Procurement begins. |
| Week 8 | Wed Nov 18 | Report 4 – Build progress: frame assembled and at least one axis moving; test plan with preliminary measurements; log of design iterations and changes since freeze. |
| Week 10 | Wed Dec 2 | Final presentation: prototype demonstration, poster and competition. |
| Post-finals | TBA | Final project report. |